DATA CENTRES
Los Angeles - One Wilshire

LOS ANGELES
One Wilshire

  • 3 MW of power available immediately; 9MW currently in design process with LADWP.
  • 21 MW of utility power on site, expandable by 28 MW to a total of 49 MW.
  • Approximately 24,000 SF floorplates
FULL DETAILS
Seattle - Komo Suite 300

SEATTLE -
Komo Plaza - Suite 300

  • TURN KEY
  • 7,938 RSF
  • 1.2MW total power
  • (2)800 kVa UPS units in 2N
    (expandable)
  • Ten (10) 40 ton CRAH units in N+1
  • 13'6" Slab to Slab floor heights
    with 18" raised floor
FULL DETAILS
Seattle - Komo Suite 380

SEATTLE
Komo Plaza - Suite 380

  • TURN KEY
  • 2,327 RSF
  • 298kW total critical power
  • 300kW of UPS in 2N
  • 3 (60ton) CRAH units N+1
    Cooling
  • 13'6" Slab to Slab floor heights
    with 18" raised floor
FULL DETAILS
Seattle - Komo Suite 500

SEATTLE
Komo Plaza - Suite 500

  • POWERED SHELL
  • 15,641 RSF floorplate
  • 3MW total power
  • 13'6" Slab to Slab floor heights
    with 18" raised floor
FULL DETAILS

Contact us

EMEA

Mark Trevor

Partner

email Mark

+44 (0) 20 3296 4014

Begoña Cerdán

Partner

email Begoña

+44 (0) 20 3296 4015

© 2016 Cushman & Wakefield

The Misrepresentation Act 1967. Cushman & Wakefield (and any joint agent appointed) for themselves and for vendors or lessors of this property, whose agents they are, gives notice that: 1 The particulars are produced in good faith, but are a general guide only and do not constitute any part of a contract. 2 No person in the employment of the agent(s) has any authority to make or give any representation or warranty whatsoever in relation to this property. 3 The property is offered subject to contract and unless otherwise stated all rents are quoted exclusive of VAT. 4 Nothing in these particulars should be deemed a statement that the property is in good condition, or that any services or facilities are in working order. 5 Unless otherwise stated, no investigations have been made regarding pollution, or potential land, air or water contamination. Interested parties are advised to carry out their own investigations if required.

December 2015